Case Study

Enabling Pre-emptive Recommendations for Inventory Waste Reduction using Databricks and Azure Data Factory CPG

Enabling Pre-emptive Recommendations for Inventory Waste Reduction using Databricks and Azure Data Factory CPG

Finished Goods Inventory Waste was an ~$100M annual problem for our client, a leading global Food and Beverage (F&B) conglomerate. Their existing systems provided retrospective or backward-looking data and insights on inventory waste metrics, which was not very helpful.

Industry : Consumer Goods & Services